Building Connection

Main Menu

  • Articles
    • Columns
    • Features
  • News
    • Business Matters
    • Design
    • Fire safety
    • Heritage Trades
    • Materials
    • Prefabrication
    • Research
    • Safety
    • Sustainability
  • Products
    • Adhesives and sealants
    • Bricks
    • Cladding
    • Concrete
    • Doors
    • Fences
    • Flooring
    • Interiors
    • Joinery
    • Pest control
    • Plumbing
    • Roofing
    • Steel
    • Storage
    • Technology
    • Tiling
    • Timber
    • Tools & clothing
    • Vehicles
    • Walls
    • Waterproofing
    • Windows
  • Resources
    • Building TV
    • Standards and Regulations

logo

Building Connection

  • Articles
    • Columns
    • Features
  • News
    • Business Matters
    • Design
    • Fire safety
    • Heritage Trades
    • Materials
    • Prefabrication
    • Research
    • Safety
    • Sustainability
  • Products
    • Adhesives and sealants
    • Bricks
    • Cladding
    • Concrete
    • Doors
    • Fences
    • Flooring
    • Interiors
    • Joinery
    • Pest control
    • Plumbing
    • Roofing
    • Steel
    • Storage
    • Technology
    • Tiling
    • Timber
    • Tools & clothing
    • Vehicles
    • Walls
    • Waterproofing
    • Windows
  • Resources
    • Building TV
    • Standards and Regulations
News
Home›News›Victorian Government releases Victorian Cladding Taskforce Chairs interim report

Victorian Government releases Victorian Cladding Taskforce Chairs interim report

By Adelle King
December 13, 2017
496
0

The Victorian Government has released the Victorian Cladding Taskforce Chairs interim report, which outlines the extent of combustible cladding on buildings.

The report states the Victorian Government will take action to prevent the use of combustible cladding on Victorian buildings and makes significant recommendations to address the issue. It also says the Taskforce has identified up to 1,400 buildings as most likely having aluminium composite panels (ACP) with a polyethylene (PE) core or expanded polystyrene (EPS).

In response to these findings, the Victorian Government has directed the Victorian Building Authority (VBA) to inspect more worksites and buildings, including a state-wide audit of residential buildings likely to have combustible cladding. The VBA will provide $5m to conduct the audit.

“The Government will take immediate action to address cladding on publicly-owned buildings, including hospitals. A Department of Health and Human Services audit has already looked at 1,00 buildings and has identified eight hospitals where non-compliant cladding must be replaced,” said the Victorian Government in a press release.

Previous Article

JT21CM light-duty staple gun

Next Article

New and improved cornice adhesive by USG ...

Advertisement

SIGN UP TO OUR NEWSLETTER

Advertisement

Latest posts

  • CDU professor urges students to dig deeper into reasons behind building infrastructure
  • NSW Government introduces digital applications for high-risk work license holders
  • ResiLoop unveils collection network to protect landfills from floorcoverings
  • Modulate introduces Modulate Express container-based buildings
  • Building Commission NSW launches Construct NSW course in Mandarin
  • Home
  • About Building Connection
  • Download Media Kit
  • Contribute
  • Contact Us