Previous Page  27 / 76 Next Page
Information
Show Menu
Previous Page 27 / 76 Next Page
Page Background www.buildingconnection.com.au

2 7

A keen sense of smell and uncanny agility make the dogs indespensible members of

the Flick Anticimex termite detection team.

don’t use it as a reward because it can

be a big distraction when we’re out on

inspections,” Gavin explains.

The dogs are particularly good

on problem jobs as they can detect

old damage and where termites are

accessing a building.

“For example, in a house with termites,

you can permanently solve the problem if

you know where they are getting in. The

dogs can find that quite easily whereas,

before, the only way to do that was to

remove the walls. If we have a specific

location that we can focus on it makes it

more cost effective,” says Dan.

Generally speaking, one dog is

used per inspection but in cases of

bigger buildings a second dog might

also be used.

Currently, there aren’t too many other

businesses, aside from Flick, using

detection dogs, Dan says. The work and

responsibility of training and keeping

the dogs makes it prohibitive for most.

“There is the odd solo operator

but none on as large a scale as us,”

he says, pointing out that the dogs

are a costly investment. They also

require continuous training, as well

as specialised vehicles that adhere to

RSPCA standards for transporting them.

“We feel that it does give us the edge

over competitors. It’s an additional tool

that helps us to provide a more extensive

service and lets people feel that they are

getting value for their money,” he says,

explaining that they are hoping to extend

the service, getting the dogs out to more

of their branches around the country.

All of their services, he adds, come

with a 12-month warranty but the

termite dogs have had an excellent

track record to date.

lightweight &

Fast to install,

with less STEEL,

labour & costs

takE STRUCTURAL WALLING TO the next level.

• Superior advantages over blockwork

and traditional concrete formwork

• Waterproof and durable protective barrier

• Continuous concrete pour height up to 4.5m

(275mm profile)

• Deep basement up to 60 storeys

• Accommodates curved walls

• A range of finishing applications available

275MM

www.dincel.com.au

| 1300 dincel

110MM

155MM

200MM